(1) (BCC-W-27-R-BC-C-024) Improvement of BC Road at 1 No-Indrakathi Sarak (Namasutra Para) Under Ward No 27 BCC. (2) (BCC-W-27-R-BC-B-091) Improvement of BC Road at Diapara Sarak Under Ward No 27 BCC. (3) (BCC-W-27-D-RCC-B-003) Construction of RCC Drain at Diapara Sarak Under Ward No-27.BCC. (4) (BC
Administrator, Barishal City Corporation
W-33/ BCC-RDWMP (1) (BCC-W-27-R-BC-C-024) Improvement of BC Road at 1 No-Indrakathi Sarak (Namasutra Para) Under Ward No 27 BCC. (2) (BCC-W-27-R-BC-B-091) Improvement of BC Road at Diapara Sarak Under Ward No 27 BCC. (3) (BCC-W-27-D-RCC-B-003) Construction of RCC Drain at Diapara Sarak Under Ward No-27.BCC. (4) (BCC-27-R-BC-C-039)-Improvement of BC Road Bir MuktiJoddha Abdur Rahman Khan Sarak (Eatim Khana Sarak) Under 27 No Ward, BCC. (5) (BCC-27-D-RCC-B-004)-Construction of RCC Drain at Bir MuktiJoddha Abdur Rahman Khan Sarak (Eatim Khana Sarak) Under 27 No Ward, BCC. Construction work;Site preparation work;Building demolition and wrecking work and earthmoving work;Test drilling and boring work;Works for complete or part construction and civil engineering work;Building construction work;Engineering works and construction works;Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork;Construction work for water projects;Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry;Roof works and other special trade construction works;Building installation work;Electrical installation work;Insulation work;Plumbing and sanitary works;Fencing, railing and safety equipment installation work;Mechanical installations;Building completion work;Plastering work;Joinery and carpentry installation work;Floor and wall covering work;Painting and glazing work;Other building completion work;Hire of construction and civil engineering machinery and equipment with operator;Hire of cranes with operator;Hire of earthmoving equipment with operator
AI proposal generator
Generate a structured solution proposal in 90 seconds
Claude drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.
Related opportunities
Found via vector similarity
(1) Construction of BC Road at Tiakhali Mira Bari Bylane under 26no,ward. (2) Construction of RCC Drain & RCC Road starting from Sha Poran Sarak Al-Modina Mosque(Molla Bari) up to Firoz Nelufa Madrasha under 29no,ward. (3) (BCC-W-27-R-BC-C-010)Improvement of BC Road at Tiakhali Sarak(Ruyar Pole up-t
Administrator, Barishal City Corporation
(1) (BCC-W-23-R-ER-187)- Improvement of BC Road at Ahmad Mulla Road to Mogumder Bare Road W-23 (2) (BCC-W-23-R-ER-198)- Improvement of BC Road at Khwaja Moinuddin Chishti Road to Housing W-23 (3) (BCC-W-23-D-RCC-B-050)- Improvement of RCC Drain at Khwaja Moinuddin Chishti Road to Housing W-23 (4) (B
Administrator, Barishal City Corporation
(1) (BCC-W-29-R-BC-C-002)- Improvement of BC Road at Kashipur School to Hatim Merra Degee Road W-29 (2) (BCC-W-29-D-RCC-B-022)- Construction RCC Drain at Kashipur School to Hatim Merra Degee Road Side W-29 (3) (BCC-W-29-R-BC-C-003)- Improvement of BC Road at Infra Polytechnic to Tetultola Road W-29
Administrator, Barishal City Corporation
(1) (BCC-W-23-R-ER-131) Construction of BC Road at Sarder Bari Bridge up-to Thakur Bari Bridge Kazi Bari Road Under Ward No 23 BCC. (2) (BCC-W-23-D-RCC-B-042)Construction of RCC Drain at Sarder Bari Bridge up-to Thakur Bari Bridge Kazi Bari Road Under Ward No 23 BCC. (3) (BCC-W-23-R-HBB-136) Constru
Administrator, Barishal City Corporation
(1) (BCC-W-27-R-BC-C-001) Improvement of Nabogram main road Starting Ruyer Pull up to Vanger Pull under 27no,ward. (2) (BCC-W-27-D-RCC-C-001) Construction of BC Road Side RCC Drain Starting Ruyer Pull up to Vanger Pull under 27no,ward. (3) (BCC-W-27-D-RCC-B-002) Construction of RCC Drain at Middle R
Administrator, Barishal City Corporation