Partial Refurbishment of defects at Handforth Community Centre
Handforth Town Council
The Town Council wish to begin the official tender process for the required refurbishments to Handforth Community & Youth Centre as highlighted in the Building Survey report from April 2024 and to potentially install solar and heat pumps along with any additional energy and water saving technologies as budget allows. The tender will be up to a maximum guaranteed price of £230,000.00 to be drawn from agreed PWLB monies agreed under min ref: 25/21/10. Plus, any grant awards and available CIL monies which HTC holds. The works are to cover the following: Overall, the property presented in a satisfactory to fair of repair and structurally sound given the age of the property and some of the material elements identified. The flat roof to the upper section is nearing the end of its material service life. Given the woodwall deck it is more so important that the covering is maintained in good/dry condition. We would recommend budgeting £48,500 for the full covering and deck replacement. To the lower roofs, the deck below the covering was concealed though some evidence of further woodwool was identified in further areas, we would therefore highly recommend intrusive further investigation are undertaken alongside a competent contractor and roofer to determine the concealed conditions throughout. Allow a budget of £5,000 for further investigations and reporting. To the external walls no significant cracks were noted however noted however isolated potential settlement was noted to the rear right corner of the building. Allow a budget of £1,500 for localised repointing and monitoring in the first instance as it appear some former tarmac works were conducted which are likely connected. However, we would hight recommend clarification is sought as to the works and why it was undertaken in the first instance as it may lead to more cost repairs. It was additionally noted that the building was predominantly formed with Calcium Silicate bricks which are prone to shrinkage which lead toe
Classification
AI proposal generator
Generate a structured solution proposal in 90 seconds
Claude drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.
Related opportunities
Found via vector similarity
E-ACT RFQ for New Playgrounds at The Grange Primary and Mansfield Green Primary
E-ACT
CO6207 EV Chargers with Digital Advertising Screens
Tower Hamlets
Electric Vehicle Changes Points in London Borough of Sutton Owned Assets
London Borough of Sutton
Intelligent Transport Systems including traffic signals, variable message signs and car park signs
Southend-on-Sea City Council
The Supply and Installation of a Storage and Display Casing for the Banksy artwork ‘Draw the Raised Bridge’
Hull City Council