ERCF2509N 14 Pont Segrwyd
Conwy County Borough Council
Pont Segrwyd is in poor condition in certain areas. The south parapet and south spandrel walls are failing and require restoration. There is a crack between the northwest sidewall and the bridge abutment. Other areas on the bridge and adjacent wall are affected by vegetation ingress and loss of pointing. The primary works are: - Take down section of existing south parapet, spandrel wall and northwest sidewall and set aside masonry and stone slabs for reuse. - Vegetation clearance from existing structure. - Rebuild spandrel wall and parapet using existing masonry and stone from local quarry - Repair and repoint remaining sections of bridge parapets, retaining walls and spandrel walls. - Construction of southwest river training wall, repurposing existing stone parapet slabs.
Classification
AI proposal generator
Generate a structured solution proposal in 90 seconds
Claude drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.
Related opportunities
Found via vector similarity
Main Contractor for Site Drainage Works at Glen Eden Primary School
Board of Trustees - Approve by BoT - ie. School Principal
St Oswald's Church, Coney Hill: To prepare for a Sustainable Future
Arnold Bartosch Ltd
Mark Twain NF Beaver Lake Dam Rehabilitation
USDA-FS, STEWARDSHIP CONTRACTING BRANCH
France – Engineering works and construction works – RN1 - REPARATION DU PONT DE LA GABARRE : REPARATION ET RENFORCEMENT DU TABLIER
Région Guadeloupe
Little Petherick Viaduct Refurbishment - Camel Trail Nr Padstow Cornwall
Corserv Solutions Ltd