EKFB JV - Highways Works NC2A
Eiffage Kier JV HS2 Main Civils Works, Lots C2 & C3
NC2A is the North Chilterns to Aylesbury section of C23, a part of the HS2 project managed by the EKFB Joint Venture. We are seeking a specialist subcontractor to undertake the following works within the NC2A section: The Subcontract Works includes for the provision of all management, labour, materials, plant and equipment, supervision, and other resources necessary and ancillary to safely complete the construction and handover of Highways/ footpaths works, as described in the specifications, drawings, HS2 standards Requirements and local authority specifications. The Subcontractor will be responsible for the temporary works design and temporary works construction as further detailed in this document. The subcontractor will be responsible for all permanent and temporary works relating to the Highways realignment unless otherwise excluded. The works included as part of this scope to be delivered by the subcontractor are: - Site clearance including Removal of existing drainage, kerbs, footpath, highway pavement, verges within permanent design location. - Earthworks including excavation to formation, soft spot treatment if required. - Drainage system, including temporary excavations, supply and installation of chambers, gullies, headwalls, carrier drains, filter and fin drains, fin drains, ditches, hydro brake system, non-return valve connection to existing drainage systems. - Service ducts: including supply and installation of service ducts, connections and chambers. - Road formation (asphalt surfacing by others): this includes supply and installation of geotextile separation materials highways and footways kerbs. Installation of capping and subbase layers Please express your interest within this package.
AI proposal generator
Generate a structured solution proposal in 90 seconds
Claude drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.
Related opportunities
Found via vector similarity
EKFB JV - Ancillary Culverts Works package NC2A
Eiffage Kier JV HS2 Main Civils Works, Lots C2 & C3
Balfour Beatty - Roads North of the Thames-LTC - Sheet Pile Walls
BALFOUR BEATTY CIVIL ENGINEERING LIMITED
Repair & Maintenance works of different staff quarter at Road Sub-Division-1 and Road Sub-Division-II Khulna under Road Division, Khulna during the year 2025-2026.
Khulna Road Division
Geotechnical Works and and Associated Services
Forestry and Land Scotland
26-100 Tarata Road Resilience Project Sites 2 & 5a Construction Services
New Plymouth District Council