Romania – Feasibility study – Servicii de proiectare faza SF: Lot 1-1.Podet DN 2 km 408+212 jud. Suceava;2.Podet DN 2 km 408+572 jud. Suceava;3.Podet DN 2 km 461+902 jud. Suceava;4.Pod DN 17B km 49+176 jud. Suceava;5.Pod DN 29A km 12+856 jud. Suceava;Lot 2-1.Podet DN 29C km 26+815 jud. Botosani;2.Po
COMPANIA NATIONALA DE ADMINISTRARE A INFRASTRUCTURII RUTIERE S.A.
Obiectul prezentului Contract de Servicii este elaborarea Studiului de Fezabilitate pentru urmatoarele obiective: Lot 1 1. Podet DN 2 km 408+212 judetul Suceava 2. Podet DN 2 km 408+572 judetul Suceava 3. Podet DN 2 km 461+902 judetul Suceava 4. Pod DN 17B km 49+176 judetul Suceava 5. Pod DN 29A km 12+856 judetul Suceava Lot 2 1. Podet DN 29C km 26+815 judetul Botosani 2. Pod DN 11 km 133+950 judetul Bacau 3. Pod DN 15 km 258+510 judetul Neamt 4. Pod DN 15 km 260+145 judetul Neamt 5. Pod DN 15B km 18+632 judetul Neamt in conformitate cu prevederile Caietului de Sarcini si ale legislatiei in domeniu. In conformitate cu prevederile art. 160 alin. (1) din Legea nr. 98/2016 cu modificarile si completarile ulterioare, termenul limita pana la care orice operator economic interesat de participarea la procedura de achizitie publica are dreptul de a solicita clarificari sau informatii suplimentare in legatura cu documentatia de atribuire este cu 18 zile inainte de termenul limita de depunere a ofertelor. In conformitate cu prevederile art. 160 alin. (2) din Legea 98/2016 cu modificarile si completarile ulterioare, Autoritatea Contractanta stabileste un singur termen limita in care va raspunde tuturor solicitarilor de clarificare/ informatiilor suplimentare, dupa cum urmeaza: cu 11 zile inainte de termenul limita de depunere a ofertelor. Termenul de raspuns la clarificari a fost stabilit astfel incat operatorii economici sa aiba o perioada adecvata pentru analizarea documentatiei de atribuire si, ulterior, pentru elaborarea ofertelor prin prisma raspunsurilor oferite de Autoritatea Contractanta.
AI proposal generator
Generate a structured solution proposal in 90 seconds
Claude drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.
Related opportunities
Found via vector similarity
Romania – Feasibility study – Serv de proiect faza SF pt ob:LOT1:Pod pe DN24C km57+592judBT;Pod pe DN24C km58+393judBT;Pod pe DN24C km61+448judBT;Pod pe DN24C km90+456judBT;Pod pe DN24C km98+744judBT;LOT2:PodDN17A km15+049judSV;PodDN2E km53+391judSV;PodDN2E km54+152judSV;PodDN12C km47+298judNT;PodDN
COMPANIA NATIONALA DE ADMINISTRARE A INFRASTRUCTURII RUTIERE S.A.
Romania – Feasibility study – Serv de proiect faza SF pt ob:Lot 1:Pod DN11A km 5+880,jud BC;Pod DN11A km 6+850,jud BC;Pod DN11A km 13+700,jud BC;Pod DN11A km 15+085,jud BC;Pod DN11A km 19+160,jud BC;Lot 2:Pod DN11A km 21+235,jud BC;Pod DN11A km 23+170,jud BC;Pod DN11A km 28+099,jud BC;Pod DN11A km 2
COMPANIA NATIONALA DE ADMINISTRARE A INFRASTRUCTURII RUTIERE S.A.
Romania – Road construction works – PROIECTARE SI EXECUȚIE:Drum TransRegio Feleac TR 35- Et I Centura Metropol TR 35 și Drumuri de Leg “ Faza I – Centura Metropol TR 35 şi Drumuri de leg, LOT 2- TR35 de la km 14+747(Nod 5 Floresti)la intrare Tunel 1 km19+600 (Incl. Nodul 5[Floresti], nodul 6[Cora],
Municipiul Cluj-Napoca
Romania – Road construction works – Proiectare, execuție lucrări, asistență tehnică și verificare tehnică pentru obiectivul de investiții ”MODERNIZARE DJ 178A, KM 11+700 – 32+153, COSTÂNA – PÂRTEȘTII DE SUS ȘI DJ 178D, KM 0+000 – 2+000, SOLONEȚ - CAJVANA, JUDEȚUL SUCEAVA”
Directia Judeteana de Drumuri si Poduri Suceava
Romania – Road construction works – PROIECTARE SI EXECUȚIE LUCRĂRI: „Drum TransRegio Feleac TR 35 – Etapa I Centura Metropolitană TR 35 și Drumuri de Legătură – Faza I Centura Metropolitană TR 35 şi Drumuri de legătură, Lot IV
Municipiul Cluj-Napoca