15 Nos Construction of Primary School cum Flood Shelter with street light, Lightning protection & connecting roads, Bridge/Culverts, Furniture & tree plantation (Bogra)
Local Government Engineering Department
Specific Procurement Notice Notice for Inviting Tender Works (Without Prequalification) Employer: Project Director, Resilient Infrastructure for Adaptation and Vulnerability Reduction Project (RIVER) Project, LGED. Name of the Project: Resilient Infrastructure for Adaptation and Vulnerability Reduction Project (RIVER) Project, LGED. Contract title: Construction of Primary School cum Flood Shelter with Solar PV Nano Grid, Street Light, Lightning Protection & Connecting Roads, Bridge/Culvert, Furniture and Tree Plantation at Bagura District. Project No.: IDA-71670 IFT No: LGED/RIVER/BOG/21-22/NW-16 Issued on: 15 April 2026 The Government of Bangladesh has received financing from the World Bank toward the cost of the Resilient Infrastructure for Adaptation and Vulnerability Reduction Project (RIVER) and intends to apply part of the proceeds toward payments under the contract for Construction of Primary School cum Flood Shelter with Solar PV Nano Grid, Street Light, Lightning Protection & Connecting Roads, Bridge/Culvert, Furniture and Tree Plantation at Bagura District. The Local Government Engineering Department invites Tenders from eligible Tenderers for package LGED/RIVER/BOG/21-22/NW-16. Construction of 15 nos. Primary School cum Flood Shelter with Solar PV Nano Grid, Street Light, Lightning Protection & Connecting Roads, Bridge/Culvert, Furniture and Tree Plantation at Bagura District. Duration is 20 months. Tendering will be conducted through national competitive procurement using Bangladesh Public Procurement Act and Public Procurement Rules – Open Tender Procedures and is open to all eligible Tenderers as defined in the Tendering Document. Interested eligible Tenderers may obtain further information from Project Director, RIVER Project and inspect the Tendering document during office hours 0900 to 1600 hours at the address given below. Replies to clarifications requested by Tenderers will not be emailed directly to Tenderers. All responses to clarifications wil
AI proposal generator
Generate a structured solution proposal in 90 seconds
Claude drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.
Related opportunities
Found via vector similarity
Recruitment of the Lead Insurer or insurers of the Backstop Insurance Policy for the Bridge Lending Windows (BLW)
Development Bank of Rwanda Ltd
CONSTRUCTION OF STORM WATER DRAINAGE STRUCTURES FOR MOKWA GULLY EROSION SITE IN MOKWA, NIGER STATE
Niger State ACReSAL
Construction of protective barriers, catchment and effective monitoring systems in five critical sub catchment in the Western Area
Ministry of Water Resources And Sanitation
Gas pipeline network
Bangladesh Economic Zones Authority
Package 2 -Majuro Steetscape Upgrading Program
Ministry of Works, Infrastructure and Utilities.